For applicants
Complete, checked, first time.
The same electrical connection enters a different pathway, needs different early evidence and meets a different handoff model depending only on where it is. Gridmark collects the project once and presents it the way each network asks.
How an application moves
Two archetypes first
High-power charging
About 250 kVA to 5 MVA
Public and fleet charging hubs, depots, heavy-vehicle sites. Maximum demand and diversity, harmonics, protection coordination, staging and ultimate capacity.
Hybrid sites
Charging with solar, storage or managed load
Where AS/NZS 4777, export limits and operating envelopes begin interacting with the load connection, and two applications can be required for one site.
What Gridmark does not do
It does not do the engineering. Your consultant's maximum demand calculation, protection study and single-line diagram are still theirs, and still theirs to sign.
It does not decide. It checks the pack against the network's published rules and presents the evidence next to the rule it satisfies. The network's engineer makes the decision, and Gridmark records it.
It does not compress the regulated clock. Ten business days for interval data and sixty-five for a negotiated offer are the Rules, not inefficiency. What it removes is everything around them: the wrong pathway, the missing document, the restarted clock.